0992-1624709

Contact sales department

0992-1624709

Contact sales department

Novin Almas Hotel Project, Mashhad

In the Novin Almas Hotel project in Mashhad, CDOOR designed and installed single-leaf CNC doors with custom coatings, equipping the interior of this luxurious hotel with high quality and in accordance with modern standards. This project combined beauty, durability, and precise performance to serve the hotel’s architecture.

User

Hotels

Date

1401

Door type

CNC and integrated

Project City

Mashhad

Project images

Novin Almas Hotel in Mashhad is one of the luxurious and modern accommodation complexes in this pilgrimage city, offering a unique design, prime location, and complete amenities to provide a pleasant and lavish experience for travelers. This hotel creates a striking and lasting space by blending traditional Iranian architecture with modern elements. In this context, CDOOR proudly took part in this national project by supplying and installing the hotel’s interior doors to the highest standards.

In the interior design of Novin Almas Hotel, special attention was paid to visual harmony, security, durability, and aesthetic appeal of building components. Accordingly, the doors used by CDOOR are single-leaf edge-frame types with integrated CNC designs that provide smooth and reliable performance while adding a chic look consistent with the luxury of the rooms and public areas.

The frames employed are luxurious three-sided types, made from high-quality materials and color-coordinated with the interior décor, playing a key role in maintaining the design unity of the space. Additionally, the door coatings were custom-selected according to the client’s preferences, demonstrating CDOOR’s high flexibility in meeting the needs of special and high-end projects.

High resistance to moisture, abrasion, and wear, along with easy cleaning capabilities, are among the advantages of these doors, which are especially important for high-traffic environments such as hotels. The precise and timely execution by CDOOR’s implementation team ensured the project was completed on schedule and with excellent quality.